|
Post by ignimbrite on Jun 1, 2009 22:41:28 GMT -6
There is highway construction of major proportions that begins about 4 miles south of Garryowen on I 90. When I was through there this week about 8 to 10 miles of road was torn up or about to be. The speed limit was 35 in some places, 55 in others with at least two flaggers who did a total traffic stop at times. So allow some extra time if you are traveling between the battlefield and Sheridan or points south.
Ruth
|
|
|
Post by Melani on Jun 2, 2009 22:22:15 GMT -6
Thanks, Ruth--we will be going that way and will watch out for it.
|
|
|
Post by princesstori on Jun 24, 2009 10:30:19 GMT -6
I just passed thru there a few days ago, the road work was pretty much complete on that stretch from GarryOwen to Billings.
|
|